Short answer

There is no confirmed answer: we could not find the official text or decree number of Lebanon's seismic code. Law 646/2004 requires a soil-bearing study and engineer-signed plans with every permit application[1]. Local officials quoted by Al Jazeera in February 2026 said the 2023 earthquake weakened older Tripoli buildings, many with unregulated added floors[2].

Also asked as: “Are buildings in Lebanon earthquake-proof?” · “Does Lebanon have a seismic building code?” · “Since when is there an earthquake code in Lebanon?” · “Is my Lebanese building safe in an earthquake?”

Al Jazeera reported in February 2026 that hundreds of buildings in Tripoli were at risk of collapse[2]. This page covers what was published up to 17 October 2026. It cannot tell you whether any particular building was designed for earthquakes.

Key facts

Seismic code start date
Not confirmed: decree number and text not found
Permit issued by
the head of the municipality, or the governor or caimacam outside municipal areas[1]
Soil study
Required with every building permit application[1]
2012 public safety decree
3 mandatory conditions, 12 optional tasks[3], according to a Beirut Arab University study
Collapse insurance in the law
Runs 10 years from the technical auditor's final report[1], but its implementing decree was not found
Fire caused by an earthquake
Not covered by fire insurance, according to Kallas Law Firm[4]
Building that threatens to collapse
Must be demolished within 15 days to 2 months if the owner does not act; in extreme urgency the warning can be cut to 1 day on a sworn engineer's report[1]

What the law says about new buildings

The Building Law, Law 646 of 2004, requires a prior permit to build, convert, renovate or renew any building. The application and plans must be signed by a responsible engineer and registered with the Order of Engineers in Beirut or Tripoli, and the permit is issued by the head of the municipality, or the governor or caimacam outside municipal areas[1]. The same law requires each application to include a soil-bearing study from a specialised soil-investigation office. More on what the Order of Engineers does in a permit.

A permit is granted under the laws and zoning rules in force on the day it is granted[5]. The rules a building had to meet therefore depend on its permit date, which is one more reason to see the permit itself. Here is how to check a building permit and occupancy permit.

What we could not confirm about a seismic code

We could not find the primary text or decree number of Lebanon's seismic rules, so we cannot tell you when they started or what they require. We also found no figure on how many buildings follow them, and no published way for a buyer to check whether one specific building was designed to them. Ask the Order of Engineers (in Beirut or Tripoli, whichever registered the permit) and the Directorate General of Urban Planning. Ask which seismic rules applied on the date the building's permit was granted, and whether the permit file shows a structural design that followed them.

Checks after construction are thin too. A Beirut Arab University law study says the 2012 public safety decree relies on accredited technical audit offices, and that the executive authority made them check only three basic conditions and classed the other 12 tasks, including public health and environment, as optional[3]. The same study finds that laws settling building violations weakened public safety control.

Why older buildings are the bigger worry

Al Jazeera reported in February 2026 that hundreds of Tripoli buildings were at risk because of ageing infrastructure, unregulated construction, the 2019 crisis, the 2023 earthquake and heavy rain[2]. Reports differ on the toll of the collapse of 8 February 2026: Al Jazeera says at least 15 died, Amnesty International says 14[2,6]. Amnesty says a 2024 report it published documented how failures by the authorities left Tripoli residents in unsafe houses after the 2023 earthquakes[6].

Added floors are part of the problem. Local officials quoted by Al Jazeera said many damaged older buildings had irregular or unregulated floors added that made them weaker[2]. A 2023 paper by a Lebanese University architecture academic and an adviser to the Minister of Public Works says contractors and residents build beyond their licences[7]. One engineer quoted by Al Jazeera said concrete lasts 50 to 80 years and that many central Tripoli buildings are near the end of that span. See how to tell whether a building is at risk of collapse.

Insurance and earthquakes

According to Kallas Law Firm, Lebanese fire insurance does not cover fire caused by earthquakes, volcanoes or storms, though it covers fire caused by lightning[4]. We found no source on earthquake add-on cover in Lebanon or its price, so ask an insurer for the policy wording in writing.

Law 646/2004 Art. 18 provides for insurance against total or partial collapse, phased in for buildings under mandatory technical audit and running 10 years from the technical auditor's final report[1]. The Council of Ministers decree that sets which projects it covers was not found, so whether a given building has this cover is unconfirmed.

How to check a building before you buy

  1. Get the Land Registry extract (ifadeh aqariyeh). It shows the owner, charges, mortgages and restrictions on the plot[8,9]. This page does not cover where to request it or what it costs: see how to get a Land Registry extract, or ask the Land Registry office for the property's district. To see exactly where the plot sits on the ground, read how to get a cadastral map or survey. You need the plot number and real estate district to ask about the permit file.
  2. Ask the seller or developer for the building permit and occupancy permit. Note the permit date and the engineer named on the plans, which are registered with the Order of Engineers[1]. Compare the floors you see with the floors the permit allows.
  3. Ask the Order of Engineers and the municipality. Bring the permit number and plot details, and ask which seismic rules applied on that date and whether the file shows them. No procedure for this is published, so expect to ask in person or through a lawyer or engineer.
  4. For a new building, ask about technical audit. Ask the developer in writing whether the project is under technical audit and whether a collapse insurance policy exists[1].
  5. Hire your own structural engineer. Choose one the seller did not suggest, and ask for a written report. See a structural check before buying.
  6. Ask whether the building is on an official list. LBCI reported in July 2026 that the Beirut Governorate sent the Cabinet a file of about 160 structurally damaged buildings, and the list is not public[10]. Ask the governorate or the municipality directly.

It depends on

  • The permit date. A building is held to the rules in force when its permit was granted[5]. Ask the Order of Engineers which rules applied then.
  • Added or unlicensed floors. Local officials quoted by Al Jazeera said unregulated additions weakened older Tripoli buildings[2]. Ask your engineer to compare the building with its permit.
  • Technical audit. Collapse insurance in the law applies only to buildings under mandatory technical audit[1]. Ask the developer for the audit office's report.
  • The city. Al Jazeera reported in February 2026 that Tripoli's call centre had received reports on about 650 buildings and issued 114 evacuation warnings[2]. Elsewhere, ask your own municipality.
  • Your insurance. Fire cover excludes earthquake-caused fire, according to Kallas Law Firm[4]. Ask the insurer for written wording.

Common questions

When did Lebanon's seismic building code start?

We could not confirm it. The official text and decree number were not found, so ask the Order of Engineers or the Directorate General of Urban Planning which rules applied when a building's permit was granted.

Does home insurance in Lebanon cover earthquakes?

According to Kallas Law Firm, fire insurance does not cover fire caused by earthquakes[4]. We found no source on earthquake add-on cover, so ask an insurer for the policy wording in writing.

Does reporting a building to the municipality mean it will be inspected?

Not necessarily. Al Jazeera reported that the Tripoli building that collapsed on 8 February 2026 had been reported to the municipal call centre, but engineers had not inspected it because the report did not suggest it was urgent[2].

Who is responsible for keeping a building sound?

The owner. Law 646/2004 requires the owner to keep the building maintained and stable, and to have engineers inspect it when needed or when the municipality asks[1].

Sources

Checked against these sources. The numbers in the text point here.

  1. 1.
    Law 646 of 16/12/2004 (Building Law), amending Legislative Decree 148 of 16/09/1983

    Lebanese Republic, Ministry of Public Works and Transport, Directorate General of Urban Planning (DGU) · 16 Dec 2004 · read 17 Oct 2026

  2. 2.
  3. 3.
    Public Safety in Buildings in Accordance with Lebanese Law (abstract only)

    Beirut Arab University (BAU Journal - Journal of Legal Studies, Digital Commons) · undated · read 17 Oct 2026

  4. 4.
  5. 5.
    Decree 15874 of 5/12/2005 implementing the Building Law, as amended by Decree 617 of 8/8/2007

    General Directorate of Urban Planning (DGU), Ministry of Public Works and Transport · 5 Dec 2005 · read 17 Oct 2026

  6. 6.
  7. 7.
    Lebanese building law between texts, application gaps and land scarcity

    Journal of Planner and Development (JPD), Center of Urban and Regional Planning for Postgraduate Studies, University of Baghdad · 1 Feb 2023 · read 17 Oct 2026

  8. 8.
  9. 9.
  10. 10.