Will I be compensated if the state expropriates my land or reserves part of it for a road in Lebanon?
On this page
Short answer
It depends on the project, and we could not confirm Lebanon's general expropriation law. One 2016 CDR highway framework set compensation at assessed market value, case by case[1], with extra awards that include leftover land too small to use. A road reservation works differently. A building inside one can still be demolished[2].
Also asked as: “What if part of my land is reserved for a road or expropriated in Lebanon: will I be compensated?” · “Is there compensation for expropriation in Lebanon?” · “My plot in Lebanon is affected by a road plan” · “How do I contest an expropriation offer in Lebanon?”
A building inside a road setback, or inside an approved road plan that has not been built yet, can still be demolished. Law 139/2019 keeps that right even after a settlement fine[2], and work done after 1 January 2019 is to be demolished[3]. This page covers what was published up to 17 October 2026.
Key facts
- Compensation in the 2016 CDR highway framework
- assessed market value, case by case[1], set by the Expropriation Commissions
- Extra awards there
- Fences and walls, leftover land too small to use, business loss, lost building rights[1]
- Contesting the amount there
- CDR grievance mechanism, then the Appeals Committee[1]
- Older building inside a road setback
- Settlement possible for violations built from 13 September 1971 to 31 December 2018[2,3], and demolition is still possible[2]
- Building work after 2018
- Outside the settlement scheme: violations after 1 January 2019 are demolished[3]
- Permit decision time
- 2 months on an executed road, 6 months otherwise[4]
- General expropriation law
- Not confirmed in our sources; ask a lawyer
- How long a road reservation lasts
- Not published in our sources
What one 2016 project's rules said about compensation
The only official document we could read on this is a 2016 land acquisition framework from the Council for Development and Reconstruction (CDR), written for the Nahr el Kalb-Tabarja highway. It says owners who lose all or part of their land are compensated at assessed market value. The Expropriation Commissions decide each case separately[1]. The framework sets out what owners should get. It is not a record of what anyone was actually paid.
The same framework adds awards for losses the expropriation causes. These cover rebuilding fences and walls, business losses, and lost rights such as reduced building permission on vacant lots. If the land left over is no longer fit for its purpose or is too small to use, the owner can ask for compensation or ask the state to buy it outright. A building that is only partly affected is compensated for the affected part plus repairs. Leaseholders and people using the land without title were also eligible[1].
These rules belong to one project and may not apply to others[1]. We saw Law 58/1991 cited as the general expropriation statute but could not read its text. That is why this page gives no general valuation method, deadline or rule on who starts the process. A property lawyer can read the decree that covers your plot and tell you which rules apply.
A road reservation is not the same as a taking
Law 139/2019 deals separately with buildings inside road setbacks, inside approved road plans that have not been built yet, and inside public-property setbacks[2]. No source we read says what a reservation does to the owner's title or rights while the road is still unbuilt. A lawyer or the General Directorate of Urban Planning (DGU) can tell you.
The law covers only buildings put up between 13 September 1971 and 31 December 2018[2,3]. For those, a building in such a strip can be settled for a fine based on four times the legal permit fees plus an amount tied to the notional land value. Even then, the administration can still demolish it[2]. Confirm the exact calculation with the DGU or a lawyer before you rely on a figure. Work done after 1 January 2019 falls outside the scheme and is to be demolished[3].
We found no source that says whether a Law 139/2019 settlement window is still open as of October 2026. The DGU copy of the law gives owners two years to choose removal or settlement and to file, but it quadruples the fees after one year. The Lebanese University legal database marks those articles as amended by Law 10/2022, and we have not read the amended wording[2,3]. Ask the municipality, the DGU technical office or a lawyer.
Permits take longer on affected plots. The technical administration has two months to decide when the plot is on a road that has been built. Otherwise it has up to six months, for example when a planning project affects the plot[4].
We found no source on whether an owner is paid while land is only reserved, how long a reservation can last, or whether it is written on the Land Registry extract. So a clean extract does not prove that no road line crosses the plot. Ask the municipality, the DGU and a lawyer.
Checking a plot before you buy
Kallas Law Firm advises always pairing the title check with a review of the municipal master plan, because planning, expropriation and building laws limit what an owner can do with land[5]. No source we read names the office that gives a plot's zoning. The municipality and the DGU are the likely places to ask, but this is not confirmed. There is more in how to find a plot's zoning.
Where the boundaries on the cadastral plan differ from those on the ground, the plan prevails[6,7]. Check a road line against the official plan, not against a fence or what the seller tells you. See getting a cadastral map or survey and the wider checklist before buying land.
How to check a plot for a road line or expropriation, step by step
- Get an official Land Registry extract. You request it in person at the land registry office for the property's area[9,10]. Legalmondo (June 2025) puts the fee at USD 5[9]. Kallas Law Firm (October 2025) gives about 2 business days for a physical certificate, and times vary with the office's opening days[11]. According to Legalmondo, certificates are public, so a lawyer or someone you trust can request one for you. No certificate is issued while a lien or a registration on the plot is still in process. Copies from OMT or online are unofficial and are not enough for a sale[8,9,11,12]. In April 2025, several Mount Lebanon registry offices (Baabda, Chouf, Aley, Metn, Keserwan-Jbeil) worked on set days only[13], so check the current schedule with the office before you go. Details are in how to get a Land Registry extract.
- Ask the municipality about the master plan. Bring the plot identifiers and a copy of the extract. Ask in writing whether any part of the plot lies inside an approved road plan, a road-widening line or a setback, whether the road has been built, and what can be built on the rest. Ask for a written answer or a stamped plan extract. If the municipality cannot answer, put the same questions to the DGU.
- Have a sworn surveyor place the plot on the cadastral plan. The Cadastre supervises the sworn surveyors and engineers it treats as its affiliates[14]. Ask the surveyor to mark the plot's legal boundaries and any road line on the plan, and to measure the area that lies outside it. We found no published fee or ordering procedure, so ask for a written quote first.
- Check any existing building against the setbacks. If a building sits inside a road setback, settling it under Law 139/2019 does not remove the risk of demolition[2]. A building put up after 2018 is not covered by that law at all[3]. Ask an engineer and the municipality to compare the building with the permit plans. See checking for building violations before you buy.
- If you are abroad, act through a power of attorney. The person you name can collect papers and sign for you. Missions ask for the property number, its location and a copy of the deed or extract[15,16,17]. See giving a power of attorney from abroad.
- If the state is already taking land, see a lawyer before you accept any offer. In the CDR project, owners could contest through the CDR grievance mechanism and then go to the Appeals Committee[1]. That framework provided separate awards for fences and walls, business losses and lost building rights. Photograph and list everything you would lose, and keep copies of every notice and plan you receive.
It depends on
- Which project and which authority. The CDR rules above belong to one 2016 highway project[1]. Ask the body running your project for its own acquisition framework, and have a lawyer read the decree that covers your plot.
- Whether the land is taken or only reserved. We found no source on payment for land that is only reserved on a plan. Ask the municipality and the DGU what the plan says, and ask a lawyer what you can claim.
- Whether there is a building on the strip, and when it went up. Under the CDR framework, a partly affected building is paid for the affected part plus repairs[1]. A building in a setback from 1971 to 2018 can still be demolished after a Law 139/2019 settlement[2], and work after 1 January 2019 is to be demolished[3].
- Whether you own, rent or use the land. In the CDR project, leaseholders and people using the land without title were also eligible[1]. Bring your lease or proof of use to any claim.
Common questions
Will I be paid market value if the state takes my land in Lebanon?
The 2016 CDR framework for one highway project says owners are compensated at assessed market value, decided case by case by the Expropriation Commissions[1]. We could not confirm the general expropriation law, so ask a lawyer which rules apply to your project.
Can I build on the part of my plot that is reserved for a road?
Does the Land Registry extract show a road reservation?
We found no source that says it does. Ask the municipality for the master plan, and have a sworn surveyor check the plot against the cadastral plan.
What if the state takes part of my plot and the rest is too small to use?
Under the 2016 CDR framework, the owner can ask for compensation or for the state to buy the leftover land outright[1]. Other projects may follow different rules.
Sources
Checked against these sources. The numbers in the text point here.
- 1.CDR: Land Acquisition and Resettlement Policy Framework summary (Nahr el Kalb – Tabarja highway, Lebanese Highways II)
Council for Development and Reconstruction (CDR), Lebanon · 8 Aug 2016 · read 17 Oct 2026
- 2.Law 139 of 9/7/2019 settling building violations committed 13/9/1971 to 31/12/2018
Lebanese University Legal Informatics Centre (copy of DGU text) · 9 Jul 2019 · read 17 Oct 2026
- 3.Law 139/2019 on settling building violations committed between 13/9/1971 and 31/12/2018 inclusive (Arts 3, 5, 7, 9 marked as amended by Law 10/2022)
Lebanese University Legal Information Center (legiliban) · 9 Jul 2019 · read 17 Oct 2026
- 4.Law 646 of 16/12/2004 (Building Law), amending Legislative Decree 148 of 16/09/1983
Lebanese Republic, Ministry of Public Works and Transport, Directorate General of Urban Planning (DGU) · 16 Dec 2004 · read 17 Oct 2026
- 5.Definition of Real Property and Types of Ownership in Lebanese Law (Part One of the Practical Guide to the Code of Real Property)
Kallas Law Firm · 25 May 2026 · read 17 Oct 2026
- 6.The Land Registry in Lebanese Law — Part Six of the Practical Guide to the Code of Real Property
Kallas Law Firm · 25 May 2026 · read 16 Oct 2026
- 7.Land Delimitation and Registration Works in Lebanese Law — Part Seven of the Practical Guide to the Code of Real Property
Kallas Law Firm · 25 May 2026 · read 17 Oct 2026
- 8.OMT: Viewing Title Registers (Land Registry service page)
OMT (Online Money Transfer S.A.L.) · undated · read 17 Oct 2026
- 9.How to Find Real Estate and Land Register Information in Lebanon
Legalmondo · 17 Jun 2025 · read 17 Oct 2026
- 10.Inheritance in Lebanon: Probate, Estate Declaration and Inheritance Tax (2026)
Kallas Law Firm · 27 Jun 2022 · read 17 Oct 2026
- 11.Lebanon Asset Search: How to Find Real Estate and Company Ownership Records
Kallas Law Firm · 25 Oct 2025 · read 17 Oct 2026
- 12.Viewing Title Registers Electively Through OMT
OMT (Online Money Transfer S.A.L.) · 13 Oct 2020 · read 17 Oct 2026
- 13.Work programme at the land registry offices for the current week
Annahar · 1 Apr 2025 · read 17 Oct 2026
- 14.LIBC: How GDLRC is implementing the Roadmap to Build Land Industry in Lebanon
LIBC (Lebanese International Business Council) · 21 Jan 2021 · read 17 Oct 2026
- 15.Power of Attorney
Embassy of Lebanon, Washington DC · undated · read 17 Oct 2026
- 16.Power of Attorney
Consulate General of Lebanon, Detroit · undated · read 17 Oct 2026
- 17.Power of Attorney
Embassy of Lebanon, The Hague · undated · read 17 Oct 2026
Related questions
- What should I check before buying land in Lebanon?Get an official Land Registry extract for the exact plot first, then check shares, land type, survey status, zoning and fees. Steps for buyers abroad.
- How do I find the zoning and building ratios for a plot in Lebanon?No office is published for it: get the plot's extract, then have an engineer check the master plan and exploitation factors. Steps and what to ask.
- How do I get a cadastral map or survey for a plot in Lebanon and confirm its boundaries?Get an official extract, then ask the Cadastre and a sworn surveyor; the certified plan beats the ground. Unsurveyed land, shares and deadlines explained.
- How can I find out if a property has building violations or unpaid fines before I buy it?Get an official Land Registry extract, ask the municipality for its clearance, and have an engineer check the permit. What each shows and what it misses.
- Is the deadline to settle building violations under Law 139/2019 still open?Not confirmed. Law 139/2019's deadline articles are marked as amended in 2022 and no current window is published. What it covers, whom to ask.
- How do I get a land registry extract in Lebanon and what does it cost?Ask in person at the land registry office for the property's area; one law firm says USD 5. The numbers you need, OMT and online copies, and what to check.
- How do I give a power of attorney for property in Lebanon from abroad?Sign at a Lebanese embassy or consulate, or before a local notary and then have it legalised. An apostille alone is not enough. Documents, fees, fraud risks.
- What are the steps to get a building permit from the municipality in Lebanon?You need a prior permit, signed by a responsible engineer and issued by the municipality. The steps, deadlines, documents and what is not published.