Can an apartment over 300 m² be sold unfinished and still get an occupancy permit?
On this page
Short answer
Yes, if the sale contracts say so[1]. Under Decree 15874/2005, flats over 300 m² can get a final occupancy permit without interior painting, joinery, sanitary and electrical fittings or kitchen units. The facades must still be finished first[2], and the interior works left out later need a declaration or renovation permit.
Also asked as: “Can a 300 m2+ apartment be sold as a bare shell and still get an occupancy permit in Lebanon?” · “Shell and core apartment occupancy permit Lebanon” · “Decree 15874 large apartment exemption” · “Can I buy a big flat without finishes in Lebanon?”
This page covers what was published up to 17 October 2026. We read Decree 15874/2005 as amended by Decree 617/2007[1], but we did not check whether any later decree changed the 300 m² threshold or the list of exempt works. Ask the General Directorate of Urban Planning or an engineer before you rely on it.
Key facts
- Who it applies to
- flats over 300 m²[1]
- Works that can be left out
- Interior painting, joinery, sanitary and electrical fittings, kitchen units[1]
- Condition
- The exemption is written into the sale contracts[1]
- Must be finished before the application
- The external facades[2]
- Finishing the inside later
- A declaration receipt or a renovation permit[1]
- A declaration is
- an engineer's declaration, valid one year[2]
- Facades still unfinished a year after the permit expires
- A fine of 15% of the permit fees per year[2], registered on the folio
- Decision on the occupancy permit
- within one month[2] of the application
What the exemption allows
Normally a building counts as complete for a final occupancy permit only when the facades and the interior works are done[1]. Article 5 of Decree 15874/2005 makes an exception for flats over 300 m²: they may be handed over without interior painting, joinery, sanitary and electrical fittings and kitchen units, if the sale contracts say so. If the contract has no such clause, the exemption does not apply.
The decree measures the 300 m² including areas that do not count toward the plot's surface and general exploitation factors[1]. We found no source that lists exactly which areas that brings in. Ask the engineer who checks the plans to confirm in writing that the flat is above the threshold on the decree's measure.
The exemption covers the inside only. Once the permitted building is complete, external facades included, the owner applies to the competent technical administration for the occupancy permit[2]. Our sources do not say which office that is for a given building, so ask the municipality where the building stands.
Why the final permit matters to you
Decree 15874/2005 bars selling or transferring parts of a building without a final occupancy permit, except units under Law 539/1996[1]. The Land Registry cannot divide a building into separate units unless the owner shows a duly issued occupancy permit and certificates that the building is connected to electricity and water[2]. Without that division, your flat cannot get its own folio and title deed. Here is how an apartment in a new building gets its own deed.
A provisional permit does not replace the final one. It allows living in the unit and temporary utility connections, but it is not valid for final subdivision, sale or final registration[1]. More on provisional and final occupancy permits. With the exemption, a shell flat over 300 m² can still reach a final permit and, through it, a separate deed.
Finishing the shell after you buy
The works left out still need paperwork later. When such a flat is handed over without interior finishes, the works not yet done need a declaration receipt or a renovation permit[1]. Under Law 646/2004, renovation of a lawful or regularised building needs only a written declaration, signed by a responsible engineer, endorsed by the Order of Engineers and valid for one year[2]. Our sources do not publish the Order's fee for the declaration, so ask your engineer. See whether you need a permit to renovate.
The exemption does not remove fines for unfinished facades[1]. If the external facades are unfinished when the building permit expires, the owner has one year to finish them. After that a yearly fine of 15% of the permit fees per year[2] is imposed and registered on the property's folio as a privileged debt, so it stays with the property when you buy it.
What the decree does not tell you
We found only the decree text. There is no official guide or law-firm commentary on how municipalities apply it, and no source gives model contract wording. Whether your municipality calls the document an occupancy permit or a completion certificate is not confirmed[2]. Ask the municipality's technical office, the General Directorate of Urban Planning or a Lebanese engineer, and have a lawyer read the contract clause.
How to check a shell flat over 300 m² before you sign
- Get an official Land Registry extract. It shows the owner, charges, mortgages and restrictions[3,4]. Give the governorate, district, real estate zone, property number, section and block[5,6]. Online and OMT copies are unofficial; the official certificate comes from the land registry office[5,6,7,8]. According to one law firm (Legalmondo, June 2025), you request it in person and it costs USD 5[6].
- Look for violations and fines on the folio. Violations are recorded there only at the request of the municipality or technical administration[2], so a clean extract is not proof. Ask the municipality too, as explained in checking for violations before buying.
- Have an engineer confirm the area and the facades. If you live abroad, hire a Lebanese engineer to visit, compare the building with the permit plans and confirm the flat is over 300 m² on the decree's measure[1].
- Write the exemption into the sale contract. List each work left out: interior painting, joinery, sanitary and electrical fittings, kitchen units[1]. Ask the notary or a lawyer to check the wording.
- Ask the developer about the occupancy permit. The application goes to the competent technical administration with as-built plans registered with the Order of Engineers[2], and the permit comes only after all fees and fines for extra area are paid. Ask for copies of the application and of any decision.
- Plan the fit-out with an engineer. Before work starts, get the declaration or renovation permit the remaining works need[1].
It depends on
- Later decrees. The 300 m² threshold and the list of exempt works may have changed after 2007; we did not check. Ask the General Directorate of Urban Planning or an engineer.
- The flat's size. Below the threshold, interior works must be done for the building to count as complete[1]. An engineer can confirm the measured area.
- Your contract. The exemption works only if it is written into the sale contracts[1]. A lawyer or the notary should check the clause.
- The facades. Unfinished facades can bring a yearly fine registered on the folio[2]. Ask the municipality when the building permit expires.
- What you plan to do inside. Structural strengthening and replacing roofs or balconies are allowed only in lawful or regularised buildings[2], and renovation beyond a declaration needs a prior permit. Your engineer will say which applies.
Common questions
Can a developer sell me a bare shell flat under 300 m²?
The shell exemption covers only flats over 300 m²[1]; for smaller flats the interior works must be done for the building to count as complete for a final occupancy permit. Selling parts of a building without a final permit is barred, except units under Law 539/1996.
Do I need a permit to finish the inside of a shell flat?
Will a shell flat over 300 m² get its own title deed?
It can, once the building has its final occupancy permit. The registry divides a building into units only on an occupancy permit plus electricity and water connection certificates[2].
Sources
Checked against these sources. The numbers in the text point here.
- 1.Decree 15874 of 5/12/2005 implementing the Building Law, as amended by Decree 617 of 8/8/2007
General Directorate of Urban Planning (DGU), Ministry of Public Works and Transport · 5 Dec 2005 · read 17 Oct 2026
- 2.Law 646 of 16/12/2004 (Building Law), amending Legislative Decree 148 of 16/09/1983
Lebanese Republic, Ministry of Public Works and Transport, Directorate General of Urban Planning (DGU) · 16 Dec 2004 · read 17 Oct 2026
- 3.The Land Registry in Lebanese Law — Part Six of the Practical Guide to the Code of Real Property
Kallas Law Firm · 25 May 2026 · read 16 Oct 2026
- 4.How to Buy Property in Lebanon: The Legal Steps from Verification to Inscription
Kallas Law Firm · 9 Jun 2026 · read 16 Oct 2026
- 5.OMT: Viewing Title Registers (Land Registry service page)
OMT (Online Money Transfer S.A.L.) · undated · read 17 Oct 2026
- 6.How to Find Real Estate and Land Register Information in Lebanon
Legalmondo · 17 Jun 2025 · read 17 Oct 2026
- 7.Viewing Title Registers Electively Through OMT
OMT (Online Money Transfer S.A.L.) · 13 Oct 2020 · read 17 Oct 2026
- 8.Lebanon Asset Search: How to Find Real Estate and Company Ownership Records
Kallas Law Firm · 25 Oct 2025 · read 17 Oct 2026
Related questions
- Can a developer legally sell me an apartment in a building with no occupancy permit?Not as a registered sale: Lebanese law bans selling building parts without a final occupancy permit. What is unclear, what protects you and what to check.
- What is the difference between a provisional and a final occupancy permit in Lebanon?A provisional permit lets you live in a flat but not divide, sell or register it; that needs a final permit. How to check before you pay.
- What is the occupancy permit in Lebanon and how do you get it?The permit to occupy a finished building, applied for by the owner with as-built plans. Steps, the one-month deadline, why flats need it, how to check it.
- Do I need a permit to renovate my apartment in Lebanon?It depends: renovating a lawful building needs an engineer's declaration, structural work a permit. Who signs, owners' consent, timing.
- How do I get my own title deed for an apartment in a new building in Lebanon?Only once the building's owner divides it into units at the Land Registry. What must happen first, what your deed shows, fees and how to protect yourself.
- How can I find out if a property has building violations or unpaid fines before I buy it?Get an official Land Registry extract, ask the municipality for its clearance, and have an engineer check the permit. What each shows and what it misses.
- How do I get my off-plan apartment registered in my name once the building is finished?The building's owner gets a final occupancy permit, divides the building into units at the Land Registry, then your sale is registered. Steps, fees, checks.


