Is the deadline to settle building violations under Law 139/2019 still open?
On this page
Short answer
Not confirmed. Law 139/2019 covers violations built from 13 September 1971 to 31 December 2018[1,2], and its original text gave owners two years to file, with fees quadrupled after one year. The articles setting those periods are marked as amended by Law 10/2022, in force from 15 November 2022[2,3], whose amending text we could not read. Before you rely on any window, ask the municipality, the General Directorate of Urban Planning (DGU) or a lawyer.
Also asked as: “Is the deadline to settle building violations under Law 139 of 2019 still open in Lebanon?” · “Has the Law 139 building violation settlement been extended?” · “Can I still settle a building violation under Law 139/2019?” · “Law 139 building violations deadline”
Key facts
- What it covers
- violations built from 13 September 1971 to 31 December 2018[1,2], on private property only
- Original filing window
- Two years in Arts. 3, 5 and 7, but fees quadruple after one year under Art. 5(2)[1,2]
- Later change
- Arts. 3, 5, 7 and 9 marked as amended by Law 10/2022, in force from 15 November 2022[2,3]
- Work done later
- violations after 1 January 2019 are demolished[2]
- 2022 penalty discount
- 85% off, construction violations excluded, per ALDIC's summary; ended 30 March 2023[4]
What Law 139/2019 covers
The law deals with buildings and parts of buildings that owners put up on their own private property in breach of the building laws, between 13 September 1971 and 31 December 2018 inclusive[1,2]. It does not cover public property.
Violations committed after 1 January 2019 are outside the scheme: Art. 14(5) says they are demolished by operation of law[2]. The general Building Law, Law 646/2004, separately says that conforming work done without a permit can be permitted against a fine of twice the fees on the part already built, while non-conforming work is demolished[5]. How these two rules fit together for work done after 2018 is a question for a lawyer. The general route is covered in whether a building without a permit can be legalised.
Why nobody can give you a date
The original text uses two different periods. Arts. 3 and 5(1) give owners two years from the law to choose removal or settlement and to file, while Art. 5(2) quadruples the fees after one year[1,2]. Under the 2019 text, a building that conforms to the rules but had no permit is settled for twice the permit fees, or four times for owners who file late.
The Lebanese University legal database marks Arts. 3, 5, 7 and 9 as amended by the 2022 Budget Law, which took effect on 15 November 2022[2,3]. We could not find or read the amending articles, so we cannot say whether they reopened, extended or closed the window. We found no later law that extends it. The money side of a settlement, including the discounts and instalments in the 2019 text, is in what a Law 139 settlement costs.
Two other measures are easy to confuse with Law 139. According to ALDIC's summary of the 2022 Budget Law, Art. 107 cut penalties owed to the State, municipalities and public bodies by 85% if they were fully paid before 30 March 2023, and construction violations were excluded; that date has passed[4]. Art. 47 of the 2026 Budget Law (Law 40/2026) exempted owners who had not reported changes to their buildings to the Land Registry from the double construction fee, but only if they paid before 30 June 2026, and that window has also closed[6,7].
What an unsettled violation means when you buy or sell
A violation is entered on the property's real folio at the Land Registry and stays there until it is settled or removed, with the fees and fines as a privileged debt[1]. The entry is lifted only on a written letter from the administration that asked for it. Under the 2019 text, unpaid sums carry legal interest of 12% a year; Art. 9 is marked as amended in 2022, so confirm the current rate with a lawyer. Kallas Law Firm says every charge on the folio passes to the buyer unless it is cleared first[8].
A clean extract does not prove there is no violation. Under the Building Law, a violation is recorded only at the request of the municipality or the technical administration, not automatically[5]. The municipality also gives no clearance (bara'at dhimma) until the fine and fees are paid and the violation is settled. See why a seller needs the municipal clearance.
If you are buying a flat, a violation can also stand in the way of its own title. A building can be divided into separately registered units only if the construction complies with the building laws[9]. Under the 2019 instalment rules, the balance of a settlement must be paid before the property is subdivided[1]. Where the building sits inside a road setback, settling does not remove the administration's right to demolish.
How to find out where a building stands
- Get the property's identifiers. You need the governorate, district, real estate zone and property number, plus the section and block for a flat[10,11]. Here is how to find a property's number, zone and section.
- Order an official Land Registry extract (ifadeh aqariyeh). It is requested at the Land Registry office for the area where the property lies[11,12]. According to one law firm (Legalmondo, June 2025), it is issued only in person, costs USD 5, and anyone may request it[11]. If you are abroad, someone in Lebanon has to go for you; online and OMT copies are unofficial[10,11,13,14]. According to Kallas Law Firm (October 2025), a physical certificate takes about 2 business days, though times vary with office opening days[14]. Legalmondo says none is issued while a lien or registration on the plot is still in process. See how to get an extract and what it costs, and read it for any violation entry or privileged debt.
- Ask the municipality, in writing. Go to the municipality where the building stands, or send someone, and ask: is a violation file open on this property; was it settled under Law 139/2019; is a settlement window open today, and under which article or decision; and can the seller get the municipal clearance? Ask for the answer in writing.
- Have an engineer compare the building with its permit. An engineer can check what was built against the permit plans, which catches violations the folio does not show[5]. The checks to do before you pay are in how to find violations before buying.
It depends on
- Where the building sits. Inside a road setback or an approved road plan, the administration keeps the right to demolish even after settlement[1]. Ask the municipality for the road alignment affecting the plot.
- Whether you are buying a flat. A violation can block a separate title for the unit[9]. Ask the notary whether the unit can be registered on its own.
- What the folio already shows. If a violation is entered, it stays until the requesting administration writes to lift it[1]. Ask that office what it needs to issue the letter.
Common questions
Has the Law 139/2019 deadline been extended?
Can a violation built after 2018 be settled under Law 139?
No. Law 139/2019 says violations committed after 1 January 2019 are outside the scheme and are demolished by operation of law[2].
Does a clean Land Registry extract mean there is no building violation?
No. A violation is recorded on the folio only when the municipality or technical administration asks for it[5], so also ask the municipality and have an engineer compare the building with its permit plans.
Can I still get the 85% penalty discount from the 2022 budget?
No. According to ALDIC's summary of the 2022 Budget Law, it required full payment before 30 March 2023, and construction violations were excluded from it[4].
Sources
Checked against these sources. The numbers in the text point here.
- 1.Law 139 of 9/7/2019 settling building violations committed 13/9/1971 to 31/12/2018
Lebanese University Legal Informatics Centre (copy of DGU text) · 9 Jul 2019 · read 17 Oct 2026
- 2.Law 139/2019 on settling building violations committed between 13/9/1971 and 31/12/2018 inclusive (Arts 3, 5, 7, 9 marked as amended by Law 10/2022)
Lebanese University Legal Information Center (legiliban) · 9 Jul 2019 · read 17 Oct 2026
- 3.قانون الموازنة العامة لعام 2022 (القانون 10/2022) المنشور في الجريدة الرسمية
Lebanese Ministry of Finance · 15 Nov 2022 · read 17 Oct 2026
- 4.Summary of the Budget Law 2022 (Law #10)
ALDIC (Arab Lebanese Diplomatic and International Consulting?) · 15 Nov 2022 · read 17 Oct 2026
- 5.Law 646 of 16/12/2004 (Building Law), amending Legislative Decree 148 of 16/09/1983
Lebanese Republic, Ministry of Public Works and Transport, Directorate General of Urban Planning (DGU) · 16 Dec 2004 · read 17 Oct 2026
- 6.Annual Budget Documents and Process (Budget Law 2026 index page)
Lebanese Ministry of Finance · 10 Feb 2026 · read 17 Oct 2026
- 7.Real estate fees calculator
Kallas Law Firm · 24 May 2026 · read 17 Oct 2026
- 8.How to Buy Property in Lebanon: The Legal Steps from Verification to Inscription
Kallas Law Firm · 9 Jun 2026 · read 16 Oct 2026
- 9.Condominium Ownership of Built Immovables in Lebanese Law — Eighth and Final Part of the Practical Guide to the Lebanese Code of Real Property
Kallas Law Firm · 25 May 2026 · read 17 Oct 2026
- 10.OMT: Viewing Title Registers (Land Registry service page)
OMT (Online Money Transfer S.A.L.) · undated · read 17 Oct 2026
- 11.How to Find Real Estate and Land Register Information in Lebanon
Legalmondo · 17 Jun 2025 · read 17 Oct 2026
- 12.Inheritance in Lebanon: Probate, Estate Declaration and Inheritance Tax (2026)
Kallas Law Firm · 27 Jun 2022 · read 17 Oct 2026
- 13.Viewing Title Registers Electively Through OMT
OMT (Online Money Transfer S.A.L.) · 13 Oct 2020 · read 17 Oct 2026
- 14.Lebanon Asset Search: How to Find Real Estate and Company Ownership Records
Kallas Law Firm · 25 Oct 2025 · read 17 Oct 2026
Related questions
- How much does it cost to settle a building violation under Law 139/2019, and can I pay in instalments?Under the 2019 text: twice the permit fees, 40% off fines if paid early, or three instalments. What Law 10/2022 may change and what to check.
- Can a building built without a permit be legalised in Lebanon?Often yes, if it conforms, for a multiple of the permit fees. Whether Law 139 still takes files in 2026 is unconfirmed. Costs, sale effects, steps.
- How can I find out if a property has building violations or unpaid fines before I buy it?Get an official Land Registry extract, ask the municipality for its clearance, and have an engineer check the permit. What each shows and what it misses.
- What is the municipal clearance and why does a seller need it?The municipality withholds its clearance (براءة ذمة) until building-violation fines are paid. What that means for a sale and how to check first.
- What should I check before buying land in Lebanon?Get an official Land Registry extract for the exact plot first, then check shares, land type, survey status, zoning and fees. Steps for buyers abroad.
- How do I check that a building has a valid building permit and occupancy permit before I buy or rent?Get copies from the seller, then check them at the municipality, on the Land Registry extract and with an engineer. What each permit proves.
- How do I get a land registry extract in Lebanon and what does it cost?Ask in person at the land registry office for the property's area; one law firm says USD 5. The numbers you need, OMT and online copies, and what to check.

