How do I check that a building has a valid building permit and occupancy permit before I buy or rent?
On this page
Short answer
Ask the owner for copies of both permits, then check them yourself against the Land Registry extract, at the municipality and with an engineer. Building permits are issued by the head of the municipality, or the governor or caimacam outside municipal areas[1]. The Land Registry will not finally divide a building into separate flats unless the owner shows an occupancy permit plus electricity and water connection certificates. No published rule says a buyer can get these files directly.
Also asked as: “How do I check that a building has a valid building permit and occupancy permit in Lebanon?” · “How do I know if a building in Lebanon has an occupancy permit?” · “Can I buy a flat in a building without an occupancy permit?” · “Where do I check a building permit in Lebanon?”
A clean Land Registry extract does not prove a building is legal. A violation goes on the property's folio only when the municipality or the technical administration asks for it[1]. This page covers what was published up to 17 October 2026.
Key facts
- Who issues the building permit
- the head of the municipality, or the governor or caimacam outside municipal areas[1]
- Who signs the plans
- A responsible engineer, registered with the Order of Engineers in Beirut or Tripoli[1]
- Building permit valid for
- six years, renewable once for two years[1]
- Document issued at completion
- occupancy permit (رخصة الإشغال)[1]
- Needed for a flat's own title deed
- an occupancy permit plus electricity and water connection certificates[1]
- Provisional occupancy permit
- Lets people live there, but is not valid for final subdivision, sale or final registration[2]
- Older buildings
- An official statement that the building was completed before 13 September 1971[1] can stand in for the permit
- Violations on the extract
- recorded on the real folio until settled or removed[1], but only if an authority asked
What each permit is and who issues it
Under Law 646 of 2004, the Building Law, you need a permit before you build, convert, renovate or renew any building[1]. The plans are signed by a responsible engineer and registered with the Order of Engineers in Beirut or Tripoli, and the permit is issued by the head of the municipality, or the governor or caimacam outside municipal areas. A building permit is valid for six years, renewable once for two years, and no slab or roof may be poured without a pouring permit signed by the responsible engineer.
The occupancy permit comes at the end. Once the building is finished, facades included, the owner applies to the technical administration for the occupancy permit (رخصة الإشغال)[1], with as-built plans registered with the Order of Engineers. It can be granted for a whole project, for one building or block, or for part of a building whose facades and common parts are finished. Decree 15874 also uses the term completion certificate (إفادة إنجاز البناء), and which name your municipality uses is not confirmed.
The administration must grant or refuse the occupancy permit within one month[1] of the application. If it does not answer, the owner may treat the building as licensed to occupy at his own responsibility and inform the administration in writing, provided the building conforms and fees for any extra area are paid within 2 months. The permit is granted only after all fees and fines for any area built without a permit are paid.
Why the occupancy permit decides whether a flat can be yours
The Land Registry and survey departments may not finally divide a building into separate units unless the owner shows an occupancy permit plus electricity and water connection certificates[1]. Without that division, a flat cannot get its own real folio. Once a building is divided, each unit gets a number added to the plot number and its own folio: common areas 1 to 3; units from 4[3]. If you are offered a number of shares in the whole plot instead of a numbered unit, you are buying undivided shares, and no specific flat is marked out as yours[4,5,6].
Decree 15874 of 2005 also bans selling or transferring parts of a building that has no final occupancy permit, except units under Law 539 of 1996[2]. A provisional occupancy permit is renewed every year until the building permit expires. It lets people connect water, electricity and phone and live there, but it is not valid for final subdivision, sale or final registration. More in provisional and final occupancy permits and getting your own title deed in a new building.
Older buildings may have no occupancy permit at all, and the law accepts substitutes. One is an official statement from the municipality head, governor, caimacam or finance department that the building was completed before 13 September 1971[1]. Another is a statement that the occupancy request was not decided in time, together with an engineer's conformity certificate.
What the Land Registry extract shows, and what it misses
Start with an official extract (ifadeh aqariyeh). It describes the plot and lists the owners, mortgages, seizures, other charges and pending court actions[7,8]. A building violation is recorded on the real folio until settled or removed[1], but only at the request of the municipality or the technical administration, so a clean extract does not prove the building matches its permit. We found no source saying whether the building or occupancy permit itself appears on the extract.
Some building debts do show up there. Unpaid violations under Law 139/2019 stay on the folio, with their fees and fines as a privileged debt, until settled[9]. A yearly fine of 15% of the permit fees per year[1] for facades left unfinished after the permit expires is also entered on the folio as a privileged debt. The municipality gives no clearance until fines and fees for unpermitted work are paid and the violation is settled. See how to find building violations before you buy.
To order the extract you give the governorate, district, real estate zone, property number, section and block[7,10], where they apply. You request it at the land registry office for the property's area[7,11]. Legalmondo put the fee at USD 5[7] in June 2025, and it may be collected in LBP, so ask the registry office before you go. Kallas Law Firm gave about 10 days; 2 business days[8] in October 2025, the second figure being for a physical certificate. Copies viewed online or through OMT are unofficial and cannot be used for a transaction[7,8,10,12]. Here is how to get an extract and what it costs.
Who will show you the permits
No published source says which office gives a buyer or tenant a copy of a building or occupancy permit, or whether it will give one to someone who is not the owner. The building permit is issued by the head of the municipality, or the governor or caimacam outside municipal areas[1], so start with the municipality where the property lies. If the property is outside any municipality, ask the caimacam's or governor's office. Occupancy permits are applied for at the competent technical administration, so ask the municipality which administration handled the file and ask there as well.
A 2018 Beirut Arab University journal article names three bodies involved in a building permit: the Order of Engineers, General Directorate of Urban Planning and the municipality[13]. Ask the seller or landlord for copies first. If an office will deal only with the owner, ask the owner to get copies and hand them to you before you pay anything.
How to check both permits, step by step
- Order an official Land Registry extract. Go yourself, or send someone you trust, to the land registry office for the property's area[7,11]. According to Legalmondo (June 2025), certificates are public and anyone may request one without showing a legal interest. The same source says no certificate is issued while a lien or a registration on the plot is still being processed, so a refusal can itself be a warning sign: ask the registry why[7]. On the extract, check the owner's name, whether the flat has its own unit number, and any violation or privileged-debt entry.
- Get copies of both permits from the owner. Ask for the building permit with its date and approved plans, and the occupancy permit or the statement that replaces it. A building permit runs six years, renewable once for two years[1], so check the dates. Check whether the occupancy permit is final or provisional, because a provisional one does not allow a sale or final registration[2].
- Confirm with the issuing office. At the municipality, or the caimacam's or governor's office outside municipal areas[1], ask whether the permit was issued for this plot number, whether the building has a final or only a provisional occupancy permit, and whether there are violation reports or unpaid fines. Ask whether the seller can get the municipal clearance, which is withheld until violations are settled.
- Have an engineer compare the building with the plans. Hire an engineer registered with the Order of Engineers in Beirut or Tripoli[1] to compare floors, areas and facades with the approved plans. No fee is published, so ask for a written quote. While they are there, consider a structural check.
- Ask the notary before you sign. Have the notary confirm that the unit can be sold and registered given its occupancy permit, and whether the exception for units under Law 539 of 1996 applies[2]. If you are renting, have the permit status written into the lease.
It depends on
- Final or provisional permit. Only a final occupancy permit supports subdivision, sale and final registration; a provisional one allows people to live there[2]. Ask the municipality which one the building has.
- The age of the building. A building completed before 13 September 1971 can use an official statement instead of an occupancy permit[1]. Ask the municipality or the finance department for that statement.
- A new or unfinished building. Whether the sale ban reaches a promise of sale on a unit not yet built is not confirmed, so ask a lawyer before paying a deposit. For flats over 300 m², the building can count as complete for a final occupancy permit without interior painting, joinery, sanitary and electrical fittings or kitchen units, if the sale contracts say so[2].
- Renting rather than buying. Decree 15874 prohibits occupying a building more than 3 years after the permit period ends without a final permit[2]. Ask the landlord for the permit status in writing.
Common questions
Can I buy a flat in a building that has no final occupancy permit?
Does a clean Land Registry extract mean the building has no violations?
No. A violation is recorded on the folio only when the municipality or the technical administration asks for it[1]. Ask the municipality as well, and have an engineer compare the building with its permit plans.
Can I rent a flat that only has a provisional occupancy permit?
A provisional occupancy permit allows living in the unit and temporary water, electricity and phone connections, and it is renewed yearly until the building permit expires. It does not allow a sale or final registration[2].
How long does the administration have to decide on an occupancy permit?
The competent technical administration must grant or refuse it within one month of the application[1]. If it does not decide, the owner may treat the building as licensed to occupy at his own responsibility and inform the administration in writing, provided the building conforms and fees for any extra area are paid within 2 months.
Sources
Checked against these sources. The numbers in the text point here.
- 1.Law 646 of 16/12/2004 (Building Law), amending Legislative Decree 148 of 16/09/1983
Lebanese Republic, Ministry of Public Works and Transport, Directorate General of Urban Planning (DGU) · 16 Dec 2004 · read 17 Oct 2026
- 2.Decree 15874 of 5/12/2005 implementing the Building Law, as amended by Decree 617 of 8/8/2007
General Directorate of Urban Planning (DGU), Ministry of Public Works and Transport · 5 Dec 2005 · read 17 Oct 2026
- 3.Condominium Ownership of Built Immovables in Lebanese Law — Eighth and Final Part of the Practical Guide to the Lebanese Code of Real Property
Kallas Law Firm · 25 May 2026 · read 17 Oct 2026
- 4.The Land Registry in Lebanese Law — Part Six of the Practical Guide to the Code of Real Property
Kallas Law Firm · 25 May 2026 · read 16 Oct 2026
- 5.Definition of Real Property and Types of Ownership in Lebanese Law (Part One of the Practical Guide to the Code of Real Property)
Kallas Law Firm · 25 May 2026 · read 17 Oct 2026
- 6.Legislative and Administrative Land and Property Rights Framework. Lebanon
GLTN / UN-Habitat · May 2024 · read 16 Oct 2026
- 7.How to Find Real Estate and Land Register Information in Lebanon
Legalmondo · 17 Jun 2025 · read 17 Oct 2026
- 8.Lebanon Asset Search: How to Find Real Estate and Company Ownership Records
Kallas Law Firm · 25 Oct 2025 · read 17 Oct 2026
- 9.Law 139 of 9/7/2019 settling building violations committed 13/9/1971 to 31/12/2018
Lebanese University Legal Informatics Centre (copy of DGU text) · 9 Jul 2019 · read 17 Oct 2026
- 10.OMT: Viewing Title Registers (Land Registry service page)
OMT (Online Money Transfer S.A.L.) · undated · read 17 Oct 2026
- 11.Inheritance in Lebanon: Probate, Estate Declaration and Inheritance Tax (2026)
Kallas Law Firm · 27 Jun 2022 · read 17 Oct 2026
- 12.Viewing Title Registers Electively Through OMT
OMT (Online Money Transfer S.A.L.) · 13 Oct 2020 · read 17 Oct 2026
- 13.Building Permit: A Critical Review of the Legal Framework in Lebanon (abstract)
BAU Journal - Health and Wellbeing (Beirut Arab University, Digital Commons) · undated · read 17 Oct 2026
- 14.Law 139/2019 on settling building violations committed between 13/9/1971 and 31/12/2018 inclusive (Arts 3, 5, 7, 9 marked as amended by Law 10/2022)
Lebanese University Legal Information Center (legiliban) · 9 Jul 2019 · read 17 Oct 2026
Related questions
- What is the difference between a provisional and a final occupancy permit in Lebanon?A provisional permit lets you live in a flat but not divide, sell or register it; that needs a final permit. How to check before you pay.
- How can I find out if a property has building violations or unpaid fines before I buy it?Get an official Land Registry extract, ask the municipality for its clearance, and have an engineer check the permit. What each shows and what it misses.
- How do I get a land registry extract in Lebanon and what does it cost?Ask in person at the land registry office for the property's area; one law firm says USD 5. The numbers you need, OMT and online copies, and what to check.
- How do I get my own title deed for an apartment in a new building in Lebanon?Only once the building's owner divides it into units at the Land Registry. What must happen first, what your deed shows, fees and how to protect yourself.
- What is the occupancy permit in Lebanon and how do you get it?The permit to occupy a finished building, applied for by the owner with as-built plans. Steps, the one-month deadline, why flats need it, how to check it.
- Should I get a structural engineer to inspect a flat before I buy it in Lebanon?Usually yes, especially in older or war-damaged buildings. No fee scale is published. Owners' legal duties, official checks and how to hire an engineer.
- Can a building built without a permit be legalised in Lebanon?Often yes, if it conforms, for a multiple of the permit fees. Whether Law 139 still takes files in 2026 is unconfirmed. Costs, sale effects, steps.
- Can a developer legally sell me an apartment in a building with no occupancy permit?Not as a registered sale: Lebanese law bans selling building parts without a final occupancy permit. What is unclear, what protects you and what to check.